Construction Progress
The following has been accomplished on the property through the dedication of many volunteers and a small group of devoted staff.
|
Infrastructure:
- Constructed to county standard, 1.5 miles of new road through rough terrain.
- Drilled two wells, each over 500 feet deep, with 30 gpm and 50 gpm respectively.
- One mile of power line has been brought onto the property.
- Water, power and septic all installed
- Five RV sites with full hook-ups
- Hiking trails and two gazebos constructed
|
 |
|
Buildings:
- One duplex, 1,600 square feet per unit, completed with final inspection.
- Four cabins, 500 square feet each, completed with final inspection.
- 10,000-square-foot lodge completed. Awaiting completion of pump house and fire suppression system. Anticipated completion March 2010.
- 6,000-square-foot shop, with large classroom, framed and enclosed.
- Pump House, 3 tanks for fire suppression and drinking water. Storage and fire truck parking. Estimated completion, March 2010.
|
 |
|
 |

|
|

|

|